Materials planning
MRP that keeps production running on time and on budget.
- Manage raw material requirements
- Make-to-order production runs
- Track end customer demand
- Generate purchase orders to suppliers, track vendor special prices
Materials planning, shop floor and traceability in one cloud system, so your production team knows what to make, what is in stock and where every order stands. Live in about eight weeks.
From planning raw material requirements to capturing shop floor data and tracking finished goods, without chasing spreadsheets or switching between systems.
MRP that keeps production running on time and on budget.
Manage production in real time, directly from the floor.
The production tools your business needs to scale with confidence.
"We were drowning in spreadsheets and spending too much time on manual data entry instead of growing the business. Looking back, I wish we'd done it years earlier. Every month of delay cost us money, slowed our growth and frustrated our team."
One system that plans materials, runs the shop floor, tracks batches and posts finished goods to stock and the ledger from the same live numbers. Planning, making and costing stop being three separate spreadsheets.
Materials requirements planning works out what to buy and make, and when, from your sales orders, forecasts, stock and lead times. If you have ever run short mid-run or over-ordered to be safe, you need it.
Yes. Operators scan materials in and out, record output, scrap and time on a handheld or tablet on the floor. Actual cost against planned updates while the run is still going.
Yes. Supplier batches consumed and finished-goods batches produced are both recorded on the job, so you can trace in either direction for recalls, audits or customer queries in minutes.
About eight weeks for a typical SME manufacturer. Production runs on the same stock and ledger as everything else, so there is no separate system to integrate.
A demo built around how you plan, make and cost a run, not a generic tour.